ROE VALLEY INTEGRATED.
McMenamin Construction Ltd delivered the complete reinforced concrete ground beam package for the Pomeroy Forest development, including formwork, reinforcement and concrete placement.
The works also involved the precision setting of holding-down bolts, ensuring accurate positioning and tolerances for the installation of the structural steelwork.
The package was delivered to the required line, level and specification, providing a high-quality reinforced concrete foundation for the next stage of construction.